Operating Instructions
Mechanical connection
(A)
Electrical connection
Operate the pressure transmitter with a shielded cable and ground the shield at least on
one side of the cable, if the cable is longer than 30m (2-wire) or 3m (3- or 4-wire), or if it is
run outside of the building.
Use power supplies which guarantee reliable electrical isolation of the operating voltage
as per IEC/DIN EN 60204-1. Consider also the general requirements for PELV circuits in
accordance with IEC/DIN EN 60204-1. Alternative for North America: The connection may
also be made to "Class 2 Circuits" or "Class 2 Power Units" according to CEC (Canadian
Electrical Code) or NEC (National Electrical Code).
There must be no differences in potential between medium/tank and the grounding of the
junction box and the control cabinet when the shield of the cable is applied.
Ingress protection IP 68 per IEC 60529
Please make sure that the ends of cables do not allow any ingress of moisture.
18
© SICK AG • Germany • Subject to change without notice 8013156/U878 /2010-05-01
7. Starting, operation
Product label (example)
(B)
Generally the serial number on the product label applies.
Serial No.
Part No.
LFH