Abbreviation
UM
B
Table 1: Abbreviations
Shut off the gas supply, if applicable.
Disconnect the machine from the electrical supply provided in accordance with all relevant regulations and the gas supply
(if applicable), and ensure that utilities cannot be switched on again in error.
Place the stand in position and mark the hole positions; see Fig. 2, Pos. 1.
Note
Take care to comply with the minimum spacings given in the installation plan.
The gap between the machine and a wall at the side must be at least 10mm.
Drill 4 12mm holes approximately 65mm deep in the floor as shown in Fig. 3.
Insert 4 S12 rawl plugs flush in the holes; see Fig. 4, Pos. 1.
Install spacer plates (Fig. 4, Pos. 2)as appropriate and use the bubble level to level the stand.
Secure the stand to the floor with four 8 x 65 hex woodscrews (Fig. 4, Pos. 3), 8.4 washers (Fig. 4, Pos. 4) and 38mm washers
(Fig. 4, Pos. 5).
Place the machine on the stand.
Danger!
Risk of injury, particularly to the back. The relation of the weight of the machine to the physical strength of the technician must be taken
into account. For machine weight details, see the appropriate operating instructions.
Risk of crushing. When carrying out work, ensure that parts of the body, especially the hands and feet, are not positioned under or
between machines.
Install 4 clamps (Fig. 5, Pos. 1) over the machine feet.
Insert four M6 bolts (Fig. 5, Pos. 2) with B6.4 galvanized washers (Fig. 5, Pos. 3) from above through the existing holes.
Secure the 4 clamps from below with 38mm washers (Fig. 5, Pos. 4), B6.4 galvanized washers (Fig. 5, Pos. 3) and M6 nuts
(Fig. 5, Pos. 5), tightened from below.
Danger!
Risk of toppling and falling! It is absolutely essential to secure the stand to the floor and the machine to the stand.
Note
Match the height of the vent duct.
Note
Materials for securing a floating screed floor are to be provided on site.
UG 8250/UG 8330 stand:
Install the 4 rubber bumpers in the stand sides; see Fig. 6, Pos. 1.
Install the 2 side panels in the slots in the dryer base plate (Fig. 6, Pos. 2) and secure them with the 4.8 x 9.5 raised-head screws
(Fig. 6, Pos. 3).
Install the front panel (Fig. 6, Pos. 4) and secure it with the 4.8 x 9.5 raised-head screws (Fig. 6, Pos. 5).
Carry out appropriate safety checks.
Reconnect the machine to the electrical supply provided in accordance with all relevant regulations, and the gas supply
(if applicable).
am
28.09.2010
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Explanation
Miele stand
Floor fastening
Umbau- und Montageanweisung
M.-Nr. 07946040