Descargar Imprimir esta página

Miele UO 5005-30 Instrucciones De Montaje página 27

Zócalo

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
Produktgruppe 591
27 von 28
Mark positions of the holes to be drilled:
There should be a distance of 10mm from the side panels.
Mark 4 hole positions on the floor (Fig. 3, Pos. B).
Secure the stand to the floor:
Danger!
Danger of appliance tipping over. Danger of injury due to faulty installation.
Secure all stand feet to the floor.
Drill four 12mm-diameter holes, each 65mm deep, into the floor (Fig. 4, Pos. B. Fig. 4 shows a cross-sectional view of Fig. 3,
Pos. A
A).
Insert one S12 dowel flush into each hole (Fig. 5, Pos. 1).
Using shims and a level, align the stand vertically and horizontally (Fig. 5, Pos. 2).
Secure the stand to the floor with four 8 x 65 hex wood screws (Fig. 5, Pos. 3), four 8.4 washers (Fig. 5, Pos. 4) and four washers
(Fig. 5, Pos. 5).
Bolt the machine and stand together (Fig. 6, Pos. C):
Danger!
It is important to have sufficient manpower to handle the weight of the appliances. Non-compliance may result in serious bodily injury,
especially to the back. For appliance weights, refer to the appropriate operating instructions.
Be sure to keep your body and especially hands and feet out of the space under the appliance, or between the appliance and stand.
Lift the machine onto the stand.
Danger!
Danger of appliance tipping over. Danger of injury due to faulty installation.
Bolt the machine and stand together.
Insert a mounting link under each machine foot (Fig. 7, Pos. 1).
Insert an M6 hex screw (Fig. 7, Pos. 2) with galvanized B6.4 washer (Fig. 7, Pos. 3) through the top of each mounting link.
Place a washer (Fig. 7, Pos. 4), a galvanized B6.4 washer (Fig. 7, Pos. 3) and an M6 hex nut (Fig. 7, Pos. 5) on the underside of each
M6 hex screw and secure.
Note
Materials for securing floating screed are to be provided by the installer.
Stand UG 5005-30: Reinstall the casing:
Secure the side panels using M4 x 12.4 (Torx 20) screws (Fig. 8).
Secure the front panel using M4 x 12.4 (Torx 20) screws (Fig. 8).
Test the machine:
Perform a safety check.
Reconnect the machine to the power supply.
Perform a function test, using either a service program or a standard wash program.
Check for leaks at the water intake of the machine and at the drain connection (at the floor or wall).
am
12.09.2012
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Umbau- und Montageanweisung
M.-Nr. 04891571

Publicidad

loading

Este manual también es adecuado para:

Ug 5005-30