Installation; Preparing The Installation - Gaggenau AW 230 790 Instrucciones De Uso Y Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

Preparing the installation

9
CAUTION
Ensure that there are no electric wires, gas or
water pipes in the area where holes are to be
made.
1
Mark a vertical center line on the wall from the
ceiling to the lower edge of the extractor hood.
2
Mark positions for the screws and the contour of
the attachment area.
3
Drill five
/
" (8 mm) Ø holes to a depth of 3
5
16
(80 mm) for the attachments and press in the
wall plugs flush with the wall.
20
Installation
1
Screw on the angle bracket for the flue duct.
2
Screw on brackets for the extractor hood hand-
tight. Do not fully tighten screws!
/
"
5
32
3
Screw in threaded bolt, leaving it protruding out
of the wall by
©
ª
.
/
" -
/
" (5–9 mm)
3
11
16
32
¨

Publicidad

Tabla de contenido
loading

Tabla de contenido