Sears Kenmore ELITE 106 Manual De Uso Y Cuidado página 6

Refrigerador con montaje superior
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6.
Fasten the shutoff valve to the cold water pipe with the pipe
clamp. Be sure the outlet end is solidly in the I/4 in. drilled hole
in the water pipe and that the washer is under the pipe clamp.
Tighten the packing nut. Tighten the pipe clamp screws
carefully and evenly so washer makes a watertight seal. Do
not overtighten or you may crush the copper tubing.
7. Slip the compression
sleeve and compression
nut on the
copper tubing as shown. Insert the end of the tubing into the
outlet end squarely as far as it will go. Screw compression
nut
onto outlet end with adjustable wrench. Do not overtighten.
8.
Place the free end of the tubing in a container or sink, and
turn ON the main water supply. Flush the tubing until water is
clear. Turn OFF the shutoff valve on the water pipe. Coil the
copper tubing.
Connecting
to Refrigerator
Style 1
1.
Unplug refrigerator or disconnect
power.
2. Attach the copper tube to the valve inlet using a compression
nut and sleeve as shown. Tighten the compression
nut. Do
not overtighten.
3.
Use the tube clamp on the back of the refrigerator to secure
the tubing to the refrigerator as shown. This will help prevent
damage to the tubing when the refrigerator is pushed back
against the wall.
4. Turn shutoff valve ON.
5. Check for leaks. Tighten any connections
(including
connections
at the valve) or nuts that leak.
................. 1
........
2
iiiiiiiiiiiiiii
!. Tube clamp
3. Compression
nut
2. Copper tubing
4, Valve inlet
6. The ice maker is equipped with a built-in water strainer. If
your water conditions
require a second water strainer, install
it in the 1/4in. (6.35 mm) water line at either tube connection.
Obtain a water strainer from your nearest appliance dealer.
7.
Plug in refrigerator or reconnect power.
8.
Flush the water system. See the "Water System Preparation"
section.
NOTE: Allow 24 hours to produce the first batch of ice. Allow
3 days to completely fill ice container.
Style 2
1.
Unplug refrigerator or disconnect
power.
2.
Remove the shipping tape from the gray, coiled water tubing
on the rear of the refrigerator.
3. Thread the provided nut onto the coupling on the end of the
copper tubing. Tighten the nut by hand. Then tighten it with a
wrench two more turns. Do not overtighten.
1
2
3
4
5
6
1. Line to refrigerator
4. Coupling (purchased)
2. Nut (provided)
5. Ferrule (purchased)
3, Bulb
6, Nut (purchased)
4. Turn shutoff valve ON.
5. Check for leaks. Tighten any nuts or connections
(including
connections
at the valve) that leak.
6. The ice maker is equipped with a built-in water strainer. If
your water conditions
require a second water strainer, install
it in the I/4in. (6.35 mm) water line at either tube connection.
Obtain a water strainer from your nearest appliance dealer.
7.
Plug in refrigerator or reconnect power.
8.
Flush the water system. See the "Water System Preparation"
section.
NOTE: Allow 24 hours to produce the first batch of ice. Allow
3 days to completely fill ice container.
Style 3
1.
Unplug refrigerator or disconnect
power.
2.
Remove the shipping tape from the gray, coiled water tubing
on the rear of the refrigerator.
3. Thread the provided nut onto the water valve as shown.
1
i/ll
2
1. Bulb
2. Nut (provided)
NOTE: Tighten the nut by hand. Then tighten it with a wrench
two more turns. Do not overtighten.
4. Turn shutoff valve ON.
5. Check for leaks. Tighten any nuts or connections
(including
connections
at the valve) that leak.
6. The ice maker is equipped with a built-in water strainer. If
your water conditions
require a second water strainer, install
it in the I/4in. (6.35 mm) water line at either tube connection.
Obtain a water strainer from your nearest appliance dealer.
7.
Plug in refrigerator or reconnect power.
8.
Flush the water system. See the "Water System Preparation"
section.
NOTE: Allow 24 hours to produce the first batch of ice. Allow
3 days to completely fill ice container.
6

Publicidad

Tabla de contenido
loading

Tabla de contenido