Installing On A Concrete Ceiling - Epson ELPMB22 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
Adjust by carrying out the following steps.
(1) Remove the screw cap (protruding type) from the tilt adjusting screw.
(2) Partly tighten the tilt adjusting screw using the offset wrench provided.
(3) Adjust the projection position of the projector.
(4) Fully tighten the tilt adjusting screw using the offset wrench provided.
(5) Tighten the two tilt fixing screws using the hexagon wrench provided.
(6) Fit the screw cap (protruding type) onto the tilt adjusting screw.
(1)(6) Screw
cap
(2)(4) Tilt adjusting screw

3 Installing on a Concrete Ceiling

(1) Fit a commercially available anchors and bolts to the concrete ceiling.
(2) Fit the ceiling plate with a commercially available nuts.
Ceiling plate
• If there is a hanging ceiling or something else that interferes with installation on the
ceiling, purchase and fit a separate extension pipe.
For details, see "4 Extension Pipe" on page 11.
Warning
When installing the ceiling plate on the ceiling, install all parts so that
they can fully withstand the combined weight and lateral movement of
the projector body and ceiling mount. Use nuts and bolts that are M12
or higher. Failure to do so could cause the projector to fall.
Epson accepts no responsibility for the projector falling due to
inadequate installation.
10
Sideways tilt
Concrete
Horizontal
rotation
(3)
Vertical tilt
Anchors
Nuts
Bolts
(5) Tilt fixing screws
(2 pcs.)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Elpmb23

Tabla de contenido