Lockncharge iQ 20 Cart Manual De Instrucciones página 3

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
STEP 1 - Unpacking the iQ 20 Cart
After unpackaging, open the sliding lid.
NOTE: If you are supplying your own cables, follow Step 2 to install.
If you purchased the Cart with cables pre-installed, go to Step 3.
STEP 2 - Routing the device cables
Undo the two knobs to release the cable
management bracket.
Connect the device cables to each USB port of the
iQ 5 Sync Charge Box (there are 2 iQ 5 Sync Charge
Boxes per side, 4 in total).
INSTRUCTION MANUAL
Remove the Baskets and the accessories box.
After undoing the two knobs, remove the cable
management bracket from the iQ 20 Cart.

Publicidad

Tabla de contenido
loading

Tabla de contenido