Waeco VAS6380B Instrucciones De Montaje página 76

Estación de mantenimiento de aire acondicionado
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Initial start-up
5. Then follow the instructions in the display and provided here:
Press ENTER to confirm.
The maximum refrigerant quantity which can be added appears in
the display.
Enter the required amount and press ENTER to confirm.
The internal refrigerant container is filled.
When the filling process is finished, this will be confirmed by an
acoustic signal.
Close the valves and press ENTER to confirm.
6. After filling, the quantity of refrigerant in the internal container is dis-
played. Press STOP to exit the menu.
Press STOP again to access the standby menu.
The device is now ready for operation.
76
Connect the HP hose
to the external tank
then open the valve
ENTER-OK STOP-EXIT
Set the quantity
then confirm!
ENTER-OK
STOP-EXIT
VAS6380B/VAS6381B
g.
13620
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vas6381bAsc1300gAsc2300gAsc3300g

Tabla de contenido