Calibrating The Pressure Transducer - Waeco VAS6380B Instrucciones De Montaje

Estación de mantenimiento de aire acondicionado
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Service tasks
"R134a to system" indicates how many grams of refrigerant have been
added to the air conditioning systems using the menu item "Short selec-
tion" or "Free selection" since the last reset (see date).
"Vacuum time" indicates how long the vacuum pump has operated
since the last reset (see date).
"Service completed" displays the amount of service work performed
using the air conditioning service unit since the last reset (see date).
9.4

Calibrating the pressure transducer

I
NOTE
The pressure transducer has to be correctly calibrated in order to make
accurate pressure measurements.
Calibration is required:
 Every four weeks
 If the AirConServiceCenter has been subjected to heavy shaking
 Every time the vacuum pump oil is changed
 If the display shows implausible pressure readings
1. In the basic menu, use the cursor keys  or  to select "Other
selections":
2. Press ENTER to confirm.
3. Use the cursor keys  or  to select "Service":
4. Press ENTER to confirm.
100
R134a to system
g.
STOP-EXIT
Vacuum time
min.
STOP-EXIT
Service completed:
Number
STOP-EXIT
Short selection
Free selection
Other selections
ENTER-OK
Int. vessel filling
Flushing
Reset scales.
Service.
VAS6380B/VAS6381B
07/03/14
1200
07/03/14
79
08/03/14
4
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vas6381bAsc1300gAsc2300gAsc3300g

Tabla de contenido