Waeco VAS6380B Instrucciones De Montaje página 90

Estación de mantenimiento de aire acondicionado
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Operation
8.7.1
Recovery phase
1. Enter the preferred settings and press ENTER to confirm.
2. If "Rec/Recycling phase" has been selected, enter the preferred
waiting time for the pressure increase (standard is 1 min.) in the fol-
lowing menu and press ENTER to confirm, otherwise continue with
chapter "Vacuum process" on page 90.
I
NOTE
The waiting time ensures that any residual refrigerant vaporises and
can then be extracted. The vaporising residual refrigerant triggers an
increase in pressure.
8.7.2
Vacuum process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Vacuum phase" has been selected, enter the preferred vacuum
time (standard is 20 min.), otherwise continue with chapter "Filling
process" on page 91.
3. Use the cursor key  to enter the vacuum phase time.
4. Press ENTER to confirm both settings.
I
NOTE
The air conditioning system is drained completely by the vacuum pump.
This is used to remove any remaining carrier gases or moisture, and to
prepare the air conditioning system for the filling process.
90
Rec/Recycling
phase?
ENTER-OK STOP-EXIT
Pressure increase
Test time
ENTER-OK STOP-EXIT
Vacuum phase
ENTER-OK STOP-EXIT
Vacuum time
Vacuum test time
ENTER-OK STOP-EXIT
VAS6380B/VAS6381B
Yes
No
min.
5
Yes
No
min.
20
min.
4
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vas6381bAsc1300gAsc2300gAsc3300g

Tabla de contenido