NuTone PUREPOWER Serie Manual De Instalación página 13

Ocultar thumbs Ver también para PUREPOWER Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION IN EXISTING CONSTRUCTION (
INSTALLING THE INLET TUBING (
L
A
A
OCATING
TTIC
CCESS
Drill the access holes directly above the inlet location. To
accurately locate the access hole, you must find the space
between wall studs where the inlet is to be located. Observe the
area around the inlet location. Look for references you might be
able to find in the attic: electrical wiring, ductwork, doorways,
etc. Measure and note the distance from these references to
the inlet location.
Enter the attic and find the inlet wall. Have a helper downstairs
knock on the top of the wall right above the inlet location; locate
the general area by following the sound. Most likely, you will
have to clear away insulation. Ask your helper to continue
knocking until you locate the area between wall studs directly
above the inlet location.
Next,
measure
the
thickness of the wall. Mark
the exact center of the wall
where you will drill the
access hole. Remember
that the access hole must
be placed exactly in the
center of the wall.
L
B
A
OCATING
ASEMENT
To locate access holes in
the basement, remove the
toe molding or baseboard
at the base of the inlet
wall. Carefully loosen the
molding
or
baseboard
by inserting the blade of
a putty knife behind it.
Force another putty knife
between the first knife
and
the
baseboard
or
wall. Gently hammer a
cold chisel between the
two knife blades, prying the loosened molding away from the
baseboard or the baseboard away from the wall.
Directly below the inlet
location,
drill
a
1/16"
reference hole through the
floor into the basement.
(If you're drilling through
carpet, use an awl to
slightly open the weave.
This will keep the carpet
from wrapping itself around
the drill bit.) Insert a piece
of scrap wire or a clothes
hanger into the reference
hole so you can easily find
the hole in the basement.
CONT
H
OLES
Drywall
Drywall
Wall Plate
AR0021A
H
CCESS
OLES
AR0022
AR0023
'
)
Once you've found the location in the partition wall, you must
D
center the access hole in the middle of the wall. Measure half
the thickness of the wall and mark the center of the wall where
you will drill the access hole. If you cannot see the plate, you
can determine this measurement from upstairs. At the nearest
doorway, measure the thickness of the wall, including the
baseboard.
In the basement measure a distance equal to half the thickness
of the wall, using the reference hole as a starting point.
D
A
RILLING THE
CCESS
Once you are certain that
you've located the center
of the wall directly above
the inlet location, use a
2½" hole saw to cut the
access hole through the wall
plate or header and into
the wall cavity. (A 1/2" drill
is recommended.) Remove
the drill from the hole
carefully.
Now, use a flashlight to
inspect the wall cavity
through the access hole.
Make
sure
no
hidden
obstacles
will
interfere
with the tube installation.
(If this inspection reveals
an obstacle, find a new
inlet location.) Repeat this
procedure in your attic
or basement until your
access holes are drilled.
A
SSEMBLING THE
Once you've drilled the access holes, you assemble the inlet
tubing and insert it into the wall cavity. Refer to "Working With
Plastic Tubing" on pages 5-6 before you begin to assemble the
inlet lines.
Select a section of plastic
tubing and an 8" section
of the flexible inlet tubing.
Apply
cement
to
outside
of
the
tubing and to the inside of
the flexible tubing. Join the
two pieces together and
allow 5 minutes for them
to dry.
13
'
CONT
D
H
OLES
AR0024
AR0025
I
T
NLET
UBING
the
plastic
AO0013
)

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido