Installation In New Construction; Wall Inlet Rough-In - NuTone PUREPOWER Serie Manual De Instalación

Ocultar thumbs Ver también para PUREPOWER Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION IN NEW CONSTRUCTION

WALL INLET ROUGH-IN

Once the locations for the wall inlets have been determined, mount all inlet brackets.
Choose the appropriate mounting bracket for the inlet being installed. (See chart below.)
395
330
360
X
CI358
CI399
To locate a bracket on a wall stud, measure approximately 18" up from finished floor level. (Height may vary according to
individual preference.)
MODELS CF361 & CF361F
(F
U
360 I
OR
SE WITH
NLET
Refer to figure below. Nail bracket to the side of the stud so
that the front edge of the bracket is flush to the front of the
stud. (The bracket may also be nailed to the front edge of
the stud. See face mounting illustrated. For face mounting,
use locating tabs on bracket for proper alignment.)
MODEL CF361 & CF361F
SIDE
MOUNTING
3
2
/
"
8
AD0059A
Refer to figure below. Remove cardboard from plaster guard
frame. Using four (4) provided screws, attach the appropriate
flanged fitting and inlet seal to back of inlet.
Replace cardboard in plaster guard frame
AD0060
396-3
CI3301RK
CI3303RK
X
X
Rough-in and wall valve sold together
)
FACE
MOUNTING
13
1
/
"
16
R
-
S
OUGH
IN
ERIES
CF329
CF361
X
X
X
MODELS CF329 (F
When using Model CF329, glue elbow to
mounting plate. Attach to stud as shown in
figure at right.
7
CF361F
CI399RK
X
X
U
330 I
OR
SE WITH
NLETS
AD0015
)

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido