USER MANUAL IQN/F
Start-up
(1) Pre-operations checks.
a) Is the machine leveled?
b) Is the voltage and frequency the same as on the rating plate?
c) Are the water and drain connections connected and operating?
d) In case of Air Condensation: Is the air circulation appropriate?
e) Is the temperature of the room and the water appropriate?
MAXIMUM
MINIMUM
f) Is the water pressure adequate?
MINIMUM
MAXIMUM
g) The water conductivity must be at least 10 microSiemens.
NOTE: If the inlet water pressure is greater than 6 Bar (85 psi), install a pressure reducer.
(2) Starting up the machine.
1.
Open the water shut-off valve and check that there are no leaks.
2.
Connect the machine to the electrical network.
3.
The button on the control panel, OP1 (See Picture 7), must be lit red, when pressed, it will stay with a blue light
flashing for 10 min.
4.
After 10 minutes of the timer, the machine will start and OP1 will remain with the blue light fixed.
5.
Check that there is no element that rubs or vibrates.
6.
Check that it produces ice correctly. * It is normal for the machine to dispense water instead of ice at first*.
7.
Check that there is no alarm on the control panel. In such a case, restart the machine. If the problem persists, call
the technical service.
ROOM
43º C / 109.4º F
5º C / 41º F
0.1 MPa (1 Bar)
0.6 MPa (6 Bar)
6
WATER
35º C / 95º F
5º C / 41º F