Installation Procedure - Toto TS110MW16 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Lag Screws
Shower Arm
1. Slide the shower flange onto the shower arm assembly.
2. Wrap the shower arm threads with pipe tape. Screw the shower arm
into the supply line.
3. Rotate flange as shown to avoid puncturing the supply line.
4. Drill four (4) 11/64" diameter pilot holes before fastening lag screws.
5. Secure the shower flange with the lag screws.
6. Secure the shower arm by tightening the shower flange nut.
CAUTION:
Product being installed onto shower arm is heavy. Make sure there is
adequate mounting support prior to installation.
Thoroughly clean and remove debris from the water supply pipe be-
fore installation to prevent clogging the spray outlet.
To avoid leakage, do not move the showerhead after installation.

INSTALLATION PROCEDURE

Shower
Flange
Washers
Flange
4
7/8"-1"
Clearance
Hole
Recommended
Nut
Mounting Support
Studs
2x6
Brace
Elbow
Supply
Line
Supply Line

Publicidad

Tabla de contenido
loading

Tabla de contenido