Connecting The Burner To The Boiler; Assembling The Gas Train - baltur TBG 85ME Manual De Instrucciones

Ocultar thumbs Ver también para TBG 85ME:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
CONNECTING THE BURNER TO THE
BOILER
ASSEMBLING THE HEAD UNIT
A) Adjust the position of the coupling flange 5 by
loosening the screws 6 so that the combustion
head penetrates into the furnace to the extent
recommended by the generator manufacturer.
B) Position the insulating gasket 3 on the sleeve
inserting cord 2 between flange and gasket.
C) Fasten the Head unit 4 to the boiler 1 by means of
the stud bolts, washers and the nuts provided 7.
Completely seal the gap between the burner sleeve and
!
the hole in the refractory material inside the boiler door
with suitable material.

ASSEMBLING THE GAS TRAIN

There are different ways of assembling the valve train,
8, 8a and 9 as shown in the drawing. Choose the most
rational position for the set-up of the boiler room and
the position in which the gas pipeline arrives.
In case of very large valves, e.g. DN65 or DN80, make
!
sure there is a suitable support to prevent excessive
stress on the gas train fitting.
ASSEMBLING THE VENTILATING UNIT
A) Position the half-hinge on the burner scroll in line
with those on the head unit.
B) Insert the hinge pin 10 in the position considered
most suitable.
C) Connect the cables (ignition and ionisation) to the
corresponding electrodes, close the hinge, locking
the burner by means of screws 11.
7 / 20
0006081531_201203

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbg 120meTbg 150meTbg 210me

Tabla de contenido