Loading The Tool; Guide Rod Installation - Bostitch F28WW Manual De Operación Y De Mantenimiento

Clavadora neumática alimentada por barra
Ocultar thumbs Ver también para F28WW:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

LOADING THE F SERIES TOOLS
EYE PROTECTION which conforms to ANSI specifications and provides protection against
flying particles both from the FRONT and SIDE should ALWAYS be worn by the operator
and others in the work area when connecting to air supply, loading, operating or servicing
this tool. Eye protection is required to guard against flying fasteners and debris, which
could cause severe eye injury.
The employer and/or user must ensure that proper eye protection is worn. Eye protection
equipment must conform to the requirements of the American National Standards Institute,
ANSI Z87.1 and provide both frontal and side protection. NOTE: Non-side shielded spectacles
and face shields alone do not provide adequate protection.
TO PREVENT ACCIDENTAL INJURIES:
• Never place a hand or any other part of the body in nail discharge area of tool while the air supply
is connected.
• Never point the tool at anyone else.
• Never engage in horseplay.
• Never pull the trigger unless nose is directed at the work.
• Always handle the tool with care.
• Do not pull the trigger or depress the trip mechanism while loading the tool.
F21PL, F28WW, F33PT
1. Open the magazine:
Pull pusher back to
engage the latch.
NOTE: Use only nails recommended for use in BOSTITCH Framing nailers or nails which meet the
BOSTITCH specifications.
When installing metal connectors with the F21PL or F33PT: use only one stick of metal
connector nails at a time.
Never use smart trigger or contact trigger (black trigger) with metal connector attachment.
Only use sequential trigger (gray trigger) with metal connector attachment. Refer to trigger
conversion instructions included in the kit.
When installing Metal Connectors, use ONLY BOSTITCH Heat Treated Metal
Connector Nails
GUIDE ROD INSTALLATION AND REMOVAL F21PL & F33PT TOOLS:
Fig. 1
2. Load Nails: Hold nailer down
with magazine tilted downward.
Insert stick of nails
GUIDE ROD
PULL HERE AND ROTATE
COVER TO OPEN
Fig. 3
INSTALL GUIDE ROD THRU HERE TOP HOLE
FOR .113" TO .131" SHANK NAILS
ROTATE COVER BACK TO CLOSE.
COVER ROTATED OPEN
INSTALL GUIDE ROD THRU HERE BOTTOM HOLE
FOR STORAGE ALONG OUTSIDE OF MAGAZINE
FOR .131" TO .162" SHANK NAILS
ROTATE COVER BACK TO CLOSE.
3. Close Magazine: Release pusher by
first pulling back onthe pusher and then
pressing the pusher release tab. Slide
pusher against nails.
Fig. 2
ACCESS WINDOWS FOR INSTALLATION
AND REMOVAL OF GUIDE ROD.
ROTATE COVER OPEN TO
INSTALL OR REMOVE
GUIDE ROD.
INSTALL OR REMOVE
GUIDE ROD THRU
REAR OF MAGAZINE.
6
GUIDE ROD
STORAGE CHANNEL

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

F28ww-2F21plF21pl-2F33ptF33pt-2

Tabla de contenido