Applications:
• Locating Blown Fuses
With power off
: Place tester across
61-080)
the suspected fuse to
perform continuity check.
If continuity LED lights, the
fuse is good. If not, the
fuse is defective.
With power on: Place tester across the
"source" side of one fuse and the load side
of an adjoining fuse. If no or low voltage is
indicated, the fuse next to the load side prod is
blown. If line voltage is indicated, the fuse
next to the load side prod is OK. Repeat the
same test with the prods on the opposite side
of the same two fuses to check the other fuse.
4
(61-076,
Indicator
120-600V AC/DC
Neon Bulb
100-600V AC/DC
LEDs (61-076)
5-600V AC/DC
Continuity