Schedule Setup; Schedule Type Selection; Water Day Setup - Toro EVOLUTION AG Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Schedule Setup

Schedule Type Selection

®
e
EVOLUTION
AG
controller allows for exible watering by giving you three schedule types: Weekday, Interval, and Looping.
Weekday is the default scheduling type, and allows you to select individual days of the week to irrigate. Interval scheduling enables you to
select the delay between irrigations (e.g. every 3 days). Looping schedule will operate every day during the speci ed start and end time (e.g.
start the looping at 8am and stop at 5pm). While looping, watering will cycle through each valve on the schedule, followed by an optional
delay, and then start the cycle over again until the scheduled stop time.
Note: At any point, you can return to the previous menu by pressing the Left
pressing the
HOME button.
Step 1
– Press the
SCHEDULES button. Use the Up
press SELECT
.
Step 2
– While in the TYPE menu, use the Up
INTERVAL, OR LOOPING.
SCHEDULE
SCHEDULE A
SCHEDULE B
Step 3
– Press SELECT
to save the changes and return to the SCHEDULES menu.
Water Days Setup
– Press the
SCHEDULES button. If multiple schedules are enabled, use the Up
Step 1
Schedule you want to set/edit and press SELECT
schedules.
Step 2
– Use the Up
or Down
Step 3a –
e WATER DAYS menu is di erent for each of the 3 schedule types. Select your desired watering days. Follow Step 3a, 3b, or
3c, depending on the Schedule Type you selected.
Water Days Setup for Weekday Schedule
Use the Left
or Right
or turn o
the day for watering. Repeat for all days of the week. Press SELECT
FP1 and FP2 stand for Fertilizer Pump 1, and Fertilizer Pump 2. Setup for Fertilizer Pumps is optional; to setup Fertilizer
Pumps, see Programming Fertigation section of this manual.
SCHEDULE A
TYPE
WEEKDAY
WATER DAYS
SCHEDULE STARTS
VALVE RUNTIME
e Weekday Schedule type allows the selection of individual days of the week for the fertilizer pumps to operate.
(Fertilizer pumps will operate every watering day with the Interval Schedule type, and will not operate at all with the Looping
Schedule type).
e default fertilizer pump setting is NO for each day, designated by . To enable the fertilizer schedule for
each fertilizer pump (FP1 & FP2) for a speci c day, use the Left
SELECT
. A check mark
be operated together, or independently.
or Down
or Down
arrows to select the schedule type. Select either WEEKDAY,
SCHEDULE A
TYPE
WEEKDAY
WATER DAYS
SCHEDULE STARTS
VALVE RUNTIME
. See ADVANCED/SCHEDULE DETAILS section to enable multiple
arrows to select WATER DAYS menu and press SELECT
arrows to navigate within the days of the week. Use the Up
SCHEDULE A
WATER S M T W T F S
- - - - - -
FP1
FP2
- - - - - -
TODAY IS SATURDAY
will appear to indicate that the fertilizer pump selected will operate that day. FP1 and FP2 can
e default schedule type is Weekday.
button or return to the main screen by
arrows to select the Schedule you want to set/edit and
or Down
.
when nished.
or Right
arrows to navigate to that day, and press
arrows to select the
or Down
arrows to activate
9

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido