HANDLING AND LIFTING
The appliance can be handled using fork-lift or hook
equipment of suitable load-carrying capacity. Be-
fore lifting, check the position of the load's centre of
gravity.
Important
When engaging with the lifting equipment,
watch out for the gas supply pipe.
INSTALLATION OF THE APPLIANCE
All installation stages must be considered right from
production of the general layout. Before starting
these stages, as well as deciding the place of
installation, if necessary, the person author-
ised to carry out these operations must organ-
ise a "safety plan" to protect the people
directly involved, and he must also ensure
strict compliance with all legal requirements, espe-
cially those relating to mobile work-sites.
The place of installation must have all the connec-
tions needed to supply the appliance and dispose of
the production residues, must be suitably lit and
IT
must meet all legal health and hygiene require-
ments to prevent the contamination of the foods.
If necessary, fix the exact position of each individual
GB
appliance or subassembly by mark coordinates to
locate them correctly.
DE
FR
ROOM VENTILATION
The room where the appliance is installed must
ES
have air inlets to ensure that the appliance can op-
erate correctly and provide the necessary air ex-
change in the room itself.
The air inlets must be of appropriate size and must
be protected by gratings and placed so that they
cannot be obstructed.
English
Appliances must be at some distance from the wall
(at least 5 cm if the wall is not designed to be resist-
ant to a temperature of at least 150°C)
Install in accordance with the relevant legislation,
regulations and specifications in the country of use.
- 14 -
IDM-39606100700.tif
IDM-39616501200.tif
IDM-39606100800.tif