15.2 Connecting to a dust collection system
The machine must be connected to dust collection system. The system must start up
at the same time as the motor of the band saw starts. For materials with a humidity
<12 %, the air velocity at the dust collector port and in the hoses must be at least 20
m/s (for moist chips with a humidity >12 %, at least 28 m/s). The suction hoses
used must be flame-retardant (DIN4102 B1), permanently antistatic (or grounded on
both sides) and comply with the relevant safety regulations. Requirements for the
dust collection system refer to the technical data.
15.3 Connecting to a compressed air supply
Connect the compressed air unit to the compressed air connection with compressed air.
The pressure setting should be set to approx. 6 bar.
16
OPERATION
16.1 Preparatory activities
16.1.1
Filling with glue granulate
HOLZMANN MASCHINEN GmbH
NOTE
www.holzmann-maschinen.at
Open the cover of the granulate container (1)
and fill the granulate into it. Then close the
granulate container again. (Note: heating el-
ements (2) should be covered)
41
KAM215EPSV