3
4
UNPACKING
After removing the packaging make sure that the equipment's various components are
undamaged, by checking that there are no visibly damaged parts (control unit, lift struc-
ture). In case of damage do not use the equipment (the lift) and contact professionally
qualified staff (your dealer).
The packaging materials (plastic bags, expanded polystyrene, nails, screws, pieces of
wood, etc....) must not be left within reach of children since they are potential sources
of danger.
Consign these materials to the specific collection centres if they are pollutant or not
biodegradable.
INSTALLATION AREA
The machine installation requires a usable space of min. 4,060 x 7,760 mm (fig.5).
From the control position the operator has a clear view of the entire lift and the surround-
ing area. The operator must not let any unauthorised person enter this area, and must
ensure that it is clear of potentially hazardous objects.
Do not install on loose or unstable surfaces.
The surface on which the lift is installed must withstand the loads transmitted during
operation.
This surface must have a capacity of at least 25 kg/cm
and a resistance class of
2
250R'bk.
The lift contact zones to the floor must be levelled.
56
Operator's manual ERCO X5000 CT LT PT2 FAST