Waeco DC-Kit2 Instrucciones De Montaje Y De Uso página 28

Set de ampliación para cc
Ocultar thumbs Ver también para DC-Kit2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
DC-Kit2.book Seite 28 Freitag, 13. Juni 2008 3:09 15
Installing and connecting the DC kit
7.4
Connecting the B2200 Dometic roof air conditioner
I
Note
Connect roof air conditioners with a serial number lower than
802200001 in the way described in chapter "Connecting the B1600
Dometic roof air conditioner" on page 28.
➤ Remove the outlet panel of the roof air conditioner, if necessary also re-
move the upper cover (
➤ Join on/off cable for B2200 to the plug connector on the circuit board
(fig. 5, page 4).
I
Note
Guide the on/off cable carefully past the fan.
➤ Join the universal connection cable to the on/off cable of the B2200.
➤ Connect the universal connection cable with connections I2 and I5 of the
charging current distributor (
➤ Attach the outlet panel of the roof air conditioner (
page 4).
➤ Run the connection cable of remote control FB1 to the inverter and con-
nect (
ECW-012VS).
7.5
Connecting the B1600 Dometic roof air conditioner
e
Caution!
Do not connect remote control FB1 because inverter shutdown
due to a low voltage signal from the ECL-102 will no longer function
properly.
➤ Connect the open cable ends of the control cable to remote control FB2.
➤ Run the control cable on the ECL-102 charging current distributor to the
inverter.
➤ Connect the round system plug of the control cable to the inverter.
➤ Cut a wire of the control cable at charging current distributor height and
join both ends of the wire with connections I2 and I3 on the charging cur-
rent distributor (
28
B2200) (fig. 4, page 4).
ECL-102) (fig. 3 1 and 3, page 4).
ECL-102) (fig. 3 1, page 4).
DC-Kit2
B2200) (fig. 4,

Publicidad

Tabla de contenido
loading

Tabla de contenido