Assembly Instructions 620Hu - Teuco 4WST28 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
GB
The product must be installed exactly as supplied by Teuco, otherwise warranty will be invalidated.
The directions for installation must be observed to the letter, as must those concerning recommended materials and
the accessories supplied with the product.
Electrical connections must be carried out in compliance with national safety regulations, as indicated in the
preinstallation data sheet.
This manual constitutes an integral part of the product and must be kept for future reference.
Data and specifications indicated are not binding on the company: Teuco Guzzini SpA reserves the right to make
such changes as are deemed appropriate without prior notice and without any obligation to update.
The product has been designed for domestic use. In case of heavy-duty use, as well as the technical and safety
guidelines envisaged by Teuco, it is also necessary to guarantee full compliance with specific legislation for
equipment, safety and the treatment of water, as in force in the country where the Teuco minipool is being used.
The contractor/owner is responsible for verifying and ensuring compliance with local regulations prior to installation.
1
TECHNICAL SPECIFICATIONS
The 620HU pool comprises:
- SPA-PACK: includes the whirlpool pumps and the
electrical equipment panel.
- MINIPOOL: the actual pool must be connected by
pipelines to the Spa-pack, and to the filtration unit and
overflow tank (not supplied with the 620HU).
COMPONENTS
Indicated below are the various components and
connections needed for installation of the system (fig. 9).
Minipool and pipelines
1) spill edge gutter and grating
2) metal legs
3) connections to water main (if applicable)
4) filtered and heated water inlet
5) whirlpool pump suction
6) whirlpool pump delivery
7) collection of water from spill edge
Spa-pack
8) electrical panel
9) whirlpool pumps
2
INSTALLATION
Minipool
The minipool is designed specifically for built-in type
installation, with the edge exactly at floor level; refer to the
dimensions indicated in the drawings when preparing the pit.
(N.B given that dimensional specifications may be
subject to slight variations, check all measurements
before proceeding with installation)
The pit for the built-in minipool should be cast in concrete,
observing the dimensions indicated in the drawing and
making certain that the structure is perfectly level. The slab
directly supporting the minipool must be of adequate load-
bearing capacity (see table).
Leave a void (A) at least 40 cm wide all round the minipool
to ensure sufficient freedom of access to the plumbing and
electrical equipment installed beneath the tub.
The void must be covered with removable grate decking
carried on suitably sturdy supports and affording air
passages of at least 0,3 m
adequately ventilated.
Provide channels and a drain outlet (S) at the bottom of the
pit so that water will not collect and stagnate.
Plan the routes, preparing ditches and ducts where
necessary, for the water pipelines and electrical wiring
connecting the pool to the Spa-pack and the overflow tank;
the pipelines are as indicated in this manual (figures 1 and
9), and must be positioned in such a way as to avoid any
possibility of siphoning in the system.
INSTRUCTIONS FOR INSTALLATION Art. 620HU
overall so that the pit will be
2
WARNINGS
Spa pack
The Spa-pack must be installed at a distance of less
than 8 metres from the minipool: the shorter the
pipelines can be made, the lower the pressure losses, and
the better the general performance of the whirlpool system.
The Spa-pack, in any event, must be positioned at a height
either level with or lower than the overflow tank.
It is advisable to avoid bends as far as possible, and
preferably to use flexible plastic pipe (PVC). The pipe
utilized must be able to withstand pressure up to 3 bar and
temperature up to 60 °C.
Where flexible pipe is used, make certain the properties of
the material are such as to withstand negative pressure
generated on the suction side of the pumps.
As regards the part of the installation to be built on
site, the specified diameter of the pipelines must not
be altered, for example by selecting different pipe
diameters, or fittings for pipelines of different
diameters.
Valves supplied and installed by the contractor must be of
ball type design and present a flow cross-section, when
open, equal to that of the pipeline. During normal
operation, all valves installed must be in the fully open
position (apart from the drain valves, naturally).
The Spa-pack must always be installed in an enclosed but
ventilated space, inaccessible except with keys or special
tools, and protected from water and weather.
The temperature in the enclosure housing the Spa-
pack must not exceed 40 °C.
3a
OPENING THE PACKAGING
Remove the nylon around the minipool.
Cut the strips, and remove the handrail (fig. A) and the
struts (fig. B).
3b
Remove the screws securing the minipool to the frame.
3c
Place the minipool (fig. A) horizontally; remove the bolts
securing the pool to the frame (fig. B).
3d
Remove the frame and the protective cardboard.
4
CONNECTING THE DISTRIBUTOR
Secure the distributor to the union using the special ring nut.
15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

620hu

Tabla de contenido