mundoclima MUSTR-18-H9 Manual De Instalación Y Usuario página 47

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

NOTE
Confirm the minimum drain tilt is 1/100 or more
1.3.1 Wooden construction
Put the square timber traversely over the roof beam, then install the hanging
screw bolts.
Timber over the beam
Hanging screw bolts
1.3.2 New concrete bricks
Inlaying or embedding the screw bolts.
(Blade shape insertion)
Use embedding screw bold, crock and stick harness.
Embedding screw bolt
(Pipe hanging and embedding screw bolt)
1.3.3 For Original concrete bricks
Install the hanging hook with expansible bolt into the concrete
deep to 45~50mm to prevent loose.
1.3.4
Steel roof beam structure
Install and use directly the supporting angle steel.
Hanging screw bolt
Hanging bolts
Roof beam
Ceiling
(Slide insertion)
Steel bar
Supporting
angle steel
2
Overhanging the indoor unit
- Remove the side board and the grille.
Hanging
Hanging arm
screw bolt
- Locate the hanging arm on the hanging screw bolt.
Shockproof cushion
Washer
3. Ceiling Installation
Connecting point of
refrigerant pipe(gas side)
Connecting point of
refrigerant pipe(Liquid side)
Drain point
4. Wall Mounting Installation
47
Grille
Screw nut
Hanging arm
Hanging
screw bolt
Downward declicity lower between (1/100)
Side board

Publicidad

Tabla de contenido
loading

Tabla de contenido