Battery Installation - Carrier KJR-120G1/TFBG-E Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 332
3. INSTALLATION METHOD
For flush-mounting, fasten the back plate on the switch box with 2 screws (M4×25) and
fasten it on the wall with 1 screw (M4×20). (Fig.3-6)
Screw (M4×20)
Screws (M4×25)
NOTICE
Put on a flat surface. Be careful not to distort the back plate of the wire controller
by overtightening the mounting screws.

6. Battery installation

Put the battery into the installationsite and make sure the positive side of the battery
is in accordance with the positive side of installationsite.(See Fig.3-7)
Please set the time corrected on the first time operation. Batteries in the wire
controller can timing under power failure which ensure the time keep right. When
the power restores, if the time displayed is not correct, it means the battery is dead
and replace the battery.
Back plate
Switch box
Fig 3-7
7
Fig 3-6
G B

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Kjr-120g2/tfbg-e

Tabla de contenido