Sime SOLO 25 ErP Instrucciones De Instalación Y Mantenimiento página 77

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

blinking red), contact an authorised
technician.
CLEANING AND MAINTENANCE
At the end of each heating season, it is
essential to have the boiler thoroughly
checked and cleaned out.
Preventive maintenance and checking
of the efficient operation of the equip-
ment and safety devices must be car-
ried out exclusively by the authorised
Fig. 25
technical staff.
77

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Solo 35 erpDuetto 25 erpDuetto 35 erp

Tabla de contenido