Installation And Operation; Before Installation; Installation - Quality Espresso GAGGIA G6+ Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.

Installation and operation

3.1 Before installation

Verify prior to installation
:
1.
Drainage pipe has a diameter no less than 35 mm.
2.
Network water supply connection to water softener.
(not supplied with the machine).
3.
Tap with a 3/8" G - male output.
4.
Connection box with earth and protected by a magneto-
thermal switch.
5.
Connection supply tube from water softener to machine
(supplied with the machine).
6.
Drainage pipe (supplied with the machine).
7.
Water softener.

3.2 Installation

(After unpacking of the machine, the following operations must be performed)
Check that the voltage is the same as that specified on the machine's
characteristics plate and in the documentation.
Installation and Purging the Water Softener
1
 Place the machine in its definitive location, and
connect the water supply to the water softener (2):
with the tap (1) closed, connect the short flexible
tube (not supplied) from the tap (1) to the inlet (E) of
the filter and connect the longer flexible pipe to the
outlet (S) of the filter.
 Purge the water softener by opening the tap and
following the manufacturer's instructions. Use a
bucket or the installation's drain for draining the
water until this runs clear.
2
1
1
It is advisable to adjust the water softener so that
i
the water has a hardness of between 5-8 dHº (8-
14 fHº), to avoid lime scale and to obtain optimal
coffee quality.
4
E
2
S
29
6
1
4
5
Hydraulic connection and water supply
 Connect the outlet of the water softener to the
2
water inlet from the pump (3).
 Open the tap (1).
 Ensure that the connections are airtight and that
there are no water leaks.
3
3
7
2

Hide quick links:

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Gaggia v6+

Tabla de contenido