Installation And Operation; Before Installing; Installation - Quality Espresso FUTURMAT SENSIUS Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.

Installation and operation

3.1 Before installing

Check before installing:
1. Drain hose with internal diameter not less than 35 mm.
2. Mains water feed connected to water purifier.
3. Stopcock with 3/8" G - male outlet.
4. Earthed plug protected with magnetic circuit breaker.
5. Water feed from water purifier to machine (supplied with the
machine).
6. Drain hose (supplied with the machine).
7. Water purifier.

3.2 Installation

(After unpacking the machine, take the following steps)
Check that the mains voltage is the same as that on the specifications plate and in the machine
documentation.
Installing and Purging the Water Purifier
1
Place the machine in the work area and connect the
water supply to the water purifier filter (2): with the
stopcock (1) closed, connect the short hose from the
stopcock (1) to the filter inlet (E) and connect the
longer hose to the filter outlet (S).
Purge the water purifier outlet, opening the stopcock
and following the manufacturer's instructions. Use a
bucket or the installation drainage to drain the water
until it comes out completely clean.
2
1
i
It is recommended adjusting the water purifier until
the water has a hardness of between 5-8 dHº(8-14
fHº) to avoid limescale and to achieve optimum prod-
uct quality.
4
1
E
2
S
1
6
5
Hydraulic connection and water supply
2
Connect the water purifier filter outlet to the pump
inlet (3).
Open the stopcock (1).
Make sure the connections are tight and that
there are no water leaks.
3
20
4
3
7
2

Hide quick links:

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Gaggia visacrem vetro

Tabla de contenido