4.
Installation and Start-Up
4.1 Prior to Installation
Models with connection to mains water supply
CQG081D50X / CQG081V50X / CQG091D50X / CQG091V50X - (X) Colour
This equipment shall be installed in accordance
i
with local plumbing codes
Models CQG081V50N and CQG091V50N include as
an accessory a pressure reducer and a pressure
gauge to adjust the network pressure to 1 bar.
Verify before Installing:
1. Drainage tube with an interior diameter no less
than 35 mm.
2. Mains water network supply tube connected to
water softener.
3. Stopcock with 3/8" G exit.
4. Grounded plug protected with a magneto-
thermic circuit breaker.
5. Water supply tube (supplied with machine)
from water softener.
6. Drain tube
7. Water softener
Models with internal Water Tank
CQG081A10X / CQG091A10X / CQG081A50X / CQG091A50X - (X) Color
Verify before Installing:
1. Grounded plug protected with a magneto-thermic
circuit breaker
4.2 Installation
Once the machine has been unpacked, the following steps should be performed:
Check that the electricity supply voltage is the same as that listed on the specification plate and in the machine's
documentation.
2
1
6
1
4
17
4
3
7
5
2
GB