Installation And Start-Up; Prior To Installation; Installation; Models With Connection To Mains Water Supply - Quality Espresso Ruby Office Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.

Installation and Start-Up

4.1 Prior to Installation

 Models with connection to mains water supply
CQG081D50X / CQG081V50X / CQG091D50X / CQG091V50X - (X) Colour
This equipment shall be installed in accordance
i
with local plumbing codes
Models CQG081V50N and CQG091V50N include as
an accessory a pressure reducer and a pressure
gauge to adjust the network pressure to 1 bar.
Verify before Installing:
1. Drainage tube with an interior diameter no less
than 35 mm.
2. Mains water network supply tube connected to
water softener.
3. Stopcock with 3/8" G exit.
4. Grounded plug protected with a magneto-
thermic circuit breaker.
5. Water supply tube (supplied with machine)
from water softener.
6. Drain tube
7. Water softener
Models with internal Water Tank
CQG081A10X / CQG091A10X / CQG081A50X / CQG091A50X - (X) Color
Verify before Installing:
1. Grounded plug protected with a magneto-thermic
circuit breaker

4.2 Installation

Once the machine has been unpacked, the following steps should be performed:
Check that the electricity supply voltage is the same as that listed on the specification plate and in the machine's
documentation.
2
1
6
1
4
17
4
3
7
5
2
GB

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ruby pro

Tabla de contenido