Danfoss TP7000+RF Instrucciones Del Usuario página 5

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
Installation
GB
First remove the wallplate from the back of the unit.
From the top left hand corner of the wallplate, there must be
clearances of at least 140mm to the right, 15mm to the left, 30mm
above and 100mm below in order to mount the plug-in module.
Before mounting the unit ensure the 4 DIL switches on the rear of the
unit have been moved to the required settings (see below). Factory
preset is 7-day, with Optimum Start and Chrono-proportional
control OFF.
DIL Switch Settings
All models
1
Sw
5/2 day programming
2
Sw
Optimum start contoller enabled
3
Sw
Chrono-proportional control
TP7000, M & RF models with 3/6 cycles per hour option
4
Sw
Chrono-proportional, 6 cycles / hour
NOTE
Use Chrono 3 for high thermal inertia systems, e.g. floor standing cast iron boilers.
Use Chrono 6 for low thermal inertia systems, e.g. low water content boilers and combi
boilers.
4
7 day programming
Optimum start contoller disabled
On/Off control
Chrono-proportional, 3 cycles / hour

Publicidad

Tabla de contenido
loading

Tabla de contenido