This hood is designed to be mounted on the ceiling/on a shelf, above a free-standing Hob (min. 650
mm), in:
• Ducting version: Evacuation to the outside.
• Recirculation version: Internal recirculation.
Sequence of operations - Installation
• Preparing for installation
• Drilling the Ceiling/Shelf and Fixing the support plate
• Connections
• Fitting the Hood canopy
• Functional Check
• Disposal of Packaging
Dimensions
8
EN
8