Descargar Imprimir esta página

Install The Hood (Standard Installation) - Broan Elite ALT1 Serie Manual De Instalación, Uso Y Cuidado

Ocultar thumbs Ver también para ALT1 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

N
1 ] Run house power cable between service panel and hood location. Run the house power cable
2 ] Hang hood from (4) mounting screws previously installed. Slide hood back towards wall until
3 ] Connect ductwork to hood and use metal foil duct tape to make joints secure and air-tight.
18

Install the Hood (Standard Installation)

OTE:
Two installers are recommended because of the weight of this hood.
into the hood through the strain relief previously installed in step 6 on page 10.
mounting screw heads are engaged in narrow end of keyhole slots in top of hood. While
holding the hood, tighten screws securely. Attach power cable to the hood using the strain
relief.
Make sure the damper assembly (or round duct plate) enters the ductwork and that the
damper opens and closes freely.
DUCTED INSTALLATION ONLY

Publicidad

loading

Este manual también es adecuado para:

Alt2 serie