Section 5 − Installation; Selecting A Location; Installing Work Clamp - Hobart Handler 125 EZ Manual De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

.
A complete Parts List is available at www.HobartWelder.com

5-1. Selecting A Location

(460 mm)

5-2. Installing Work Clamp

.
Tools Needed:
7/16 in.
OM-923 Page 14
SECTION 5 − INSTALLATION
!
Do not move or operate unit
where it could tip.
18 in.
Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor
weld performance and excessive heating of the work clamp.
1
6
2
5
7/16 in.
18 in.
(460 mm)
1
2
3
4
!
Special installation may be
required where gasoline or
volatile liquids are present −
see NEC Article 511 or CEC
Section 20.
1
Plug From Unit
2
Receptacle − NEMA Type
5−15R (Customer Supplied)
Locate unit near correct input
power supply.
804 122-C
1
Nut
2
Work Cable From Unit
3
Work Clamp
4
Screw
5
Work Clamp Tabs
6
Insulator Grip
Slide one insulating grip over work
cable before connecting to clamp.
Attach cable to clamp with supplied
hardware.
Bend tabs around work cable.
Slide insulating grips over handles.
Ref. 802 456

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido