Assembly - cecotec CONGA 1490 Manual De Instrucciones

Ocultar thumbs Ver también para CONGA 1490:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
ENGLISH

3. ASSEMBLY

3
Wet & dry tank installation
4.
Open the water-filling opening, fill
the tank with water and close it again
following the arrows on the picture.
5.
Completely dry the connecting plates.
6.
Introduce the
compartment and lower the handle.
7.
Introduce the Wet&dry tank (water and
dust) into the product's main body.
24
2
Main brush and mops installation
1.
1
body.
2. Install the main brush cover.
3. Adjust the mop to the tank's bottom part
and press with your hand to make sure it is well
attached.
dust tank into the
Install the main brush into the robot's main
6
7
4
5

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido