Installation and Start-up
Fig. 3
Side Injection hose
installation
* See install instructions
Fig. 4
TurboDos 100
10
(254)
*
See Note
Mount Panel
*
See Note
4
(102)
Brass
Elbow
Check Valve
Hose Assy
Hose Assy
Installation Dimensions
*Inverted models available to reverse flow direction
TurboDos 200
15
(381)
*
See Note
Standard 2" Flange
(50)
*Inverted models
available to reverse
flow direction
*
See Note
6
(152)
Side Injection Hose Installation Instructions
1. Detach elbow from hose assembly, attach elbow to
brass check valve. When attaching elbow, use wrench
on brass check valve to hold it in place to maintain
factory installation. DO NOT TIGHTEN
2. Unscrew schedule 40 cap & remove from lower side
injection outlet and attach hose assembly.
3. Screw hose assembly back onto elbow at upper side
injection inlet.
If unit is dual, repeat for other side.
If unit is a TurboDos 400 follow the above for
both injectors.
Standard 3" Flange
(76)
*Inverted models
available to reverse
flow direction
28
711.2
(reference)
Welded Kit 011928
Includes 004026 Bolt/nut sets (6)
and 197057 Flange Gaskets (6)
TurboDos 400
32
(reference)
806.14
12.75 (reference)
323.85
English: 9