Typical Installation; Important - Broan LOSONE SELECT L100 Serie Manual Del Usuario

Ocultar thumbs Ver también para LOSONE SELECT L100 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TYPICAL INSTALLATION

MOUNTING (New Frame Construction)
ROUND DUCT*
y
y
yy
y
y
ADDITIONAL
1½" FRAMING
Blower factory-shipped
in horizontal
discharge position.
GRILLE
(Polymeric
shown)
Install after
ceiling is
finished.
Factory-shipped unit installed in new construction.
MOUNTING (Existing Frame Construction)
2 X 4 FRAMING
(wide side down)
ROUND DUCT*
CEILING JOIST
(16" centers
shown)
y
MOUNTING
BRACKETS
(Attached to
y
opposite sides
of housing &
upside-down,
so housing is
flush with
finished ceiling)
GRILLE
(Polymeric shown)
Factory-shipped unit installed in existing construction.
* L100 & L150 Series uses 6" Round Duct.
L200, L250, & L300 Series uses 8" Round Duct.
Mounting brackets
factory-shipped in
position for ½"
ceiling material.
CEILING JOIST
(16" centers shown)
MOUNTING
SCREW
GRILLE
yyy
SCREW
yyy
yyy
yyy y y
y y
yyy
yyy
FINISHED
CEILING
MATERIAL
GRILLE
SCREW
LOSONE SELECT
®
L200 SERIES • L250 SERIES • L300 SERIES
TYPICAL INSTALLATION
WIRING
BLACK
TO
BLACK
WHITE
TO
WHITE
Ventilator can be wired from outside of housing.
Use UL approved connectors to wire per local codes.
DUCTING (Horizontal blower discharge)
ROUND
ELBOW*
Two ways to connect ductwork to a factory-shipped unit.
* L100 & L150 Series uses 6" Round Duct.
L200, L250, & L300 Series uses 8" Round Duct.

IMPORTANT:

Remove shipping tape from damper
Remove the shipping tape from the damper flap and make sure
that damper flap opens and closes freely inside the ductwork. Use
duct tape to make ductwork connections secure and air-tight.
Remove shipping ring from blower inlet
Remove the shipping ring from the blower inlet before operating the
ventilator.
L100 SERIES • L150 SERIES
TOP / BACK
OF HOUSING
GROUND TO
WIRING PLATE
LINE IN
ROOF CAP
ROUND
DUCT*
Page 2
WIRING
PLATE
WALL
CAP

Publicidad

Tabla de contenido
loading

Tabla de contenido