7.7 Built-in switch box
DANGER
Risk of electric shocks
The connections between switch box and
hob must be made before the mains connec-
tion!
The appliance must be cut off from the
electricity supply before the plug retainer is
opened again.
The appliance may only be connected to the
mains once the plug connection has been
made.
2
Please observe the following order:
1 Make plug connection
2 Connect the appliance to the power supply system
36
Instructions for assembly
•
•
•
1
The switch box is pre-assembled in the factory. It is
designed for installation in material thicknesses of from
13 mm to 36 mm.
Set the switch box in accordance with the material
thickness of the cupboard cover with the stud bolts and
nuts.
Please have your drilled holes in the cupboard cover
made by a qualifi ed electrician in accordance with the
dimensional drawing.
GB