Festo Soft Stop SPC11 Serie Referencia Rápida página 24

Ocultar thumbs Ver también para Soft Stop SPC11 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
5
Start−up
Caution
In order to avoid damage caused by uncushioned
movement into the end positions, make sure in the
following cases that you observe the safety instructions
as well as the information on how to proceed in the
manuals for the SPC11.
when first commissioning
after adjusting the fixed stops
after replacing components.
Instructions on commissioning the SPC11 as supplied from
the factory (without pre−parametrizing) can be found in the
System manual for the SPC11.
If the SPC11 is already pre−parametrized, carry out com
missioning as follows:
1. Before commissioning:
S Switch off the compressed air and the power supply.
S Apply a 0−signal to all P... inputs. start 0−signal
S Mount the maximum permitted mass load and the
2. Switch on the operating voltage supply.
3. Check the parameters shown after switching on.
4. Finally, switch on the compressed air supply. The valve
slide assumes the mid−position. The drive can move
slowly into one of the end positions.
24
fixed stops.
Festo SPC11−... 0404a English

Publicidad

Tabla de contenido
loading

Tabla de contenido