Descargar Imprimir esta página

Hansgrohe AXOR Starck 10751000 Manual De Instrucciones página 38

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
Commissioning and in-service tests
Commissioning
Purpose
Procedure
1.
2.
NOTE:
Table A: Guide to maximum stabilised temperatures recorded dur-
ing site tests
Application
38
Mixed water
temperature
'
In-service tests
Purpose
Procedure
1.
2.
2.
>
3.
4.
2.
NOTE:
Frequency of in-service tests TMV3*
General
1.
2.
3.
4.
*TMV2: The frequency of performing the in-service tests is 1 year
maximum.
<
>
2.

Publicidad

loading