Eaton EGS100L24R Manual Del Usuario página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

O & M Manual for the EGS AutomaticTransfer Switch
with RTC-50 Control and Integral Loadcenter - 100 Amp
.
UTILITY
LUGS
Figure 8. Cable Connection Locations (100 A).
Step 2: The generator utility sensing connections are located on
the fuse block that is installed at the bottom of the power
panel. The utility sensing wires, required for proper gener-
ator operation, are connected at this point. See Section
4.7 for more detailed information on connecting the gen-
erator utility sensing wires.
IB70-8671
UTILITY LUGS
GEN LUGS
GENERATOR
LUGS
LOAD LUGS
Figure 9. Generator Utility Sensing Wires Connection.
Step 3: Tighten all cables and wiring to specifications.
For more information visit: www.eaton.com
Instructional Booklet
Effective: July 2008
NEUTRAL
GENERATOR
UTILITY
LUGS
LUGS
UTILITY SENSING WIRE CONNECTION
Page 9
LOAD
LUGS
GROUND

Publicidad

Tabla de contenido
loading

Tabla de contenido