A11
5/8
1/2
Position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
A13
Pull wires through the strain relief.
A15
Install the wiring cover plate. Make sure all wiring connections
are inside the box or under the wiring cover plate.
New construction attaching to joist
6
43053-01 12/01/2013
A12
Screw pre-loaded screws into joist or framing.
A14
F1
Go to step F1 on page 20 to connect the wires as shown.
0
A16
Connect 4" duct and vent to the outside. Tape joints.
If ducting does not fit securely, an adapter may need
to be purchased.