Hunter 80707 El Manual Del Propietario página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

New construction suspended between joist
B11
Slide the mounting rails into brackets.
B13
Mark position of screws by using holes as a template.
B15
Insert screws, leaving space between the screw head and the
joist. Screws are not provided.
B12
Position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
B14
B16
8
43053-01 12/01/2013
5/8
1/2
1/8" Bit
Drill a hole in the center of each outline.
Attach the rails onto the screws.
5/8
1/2

Publicidad

Tabla de contenido
loading

Tabla de contenido