Installation
Step 1/Étape 1/Paso 1
Building Paper
Papier de construction
Papel de construcción
Drain Outlet
Sortie de drain
Salida del desagüe
Step 1 — Building Paper Layer
Staple building paper to the subfloor of the shower base. Do not cover the drain
outlet with building paper.
Step 2 — Prepare Tile-In Drain
Remove the screws from the strainer plate. Set the screws, plate, ring, and body
aside.
Remove the screws from the collar to separate the collar from the flange adapter.
Set the screws and collar aside.
Apply PVC cement to the outside of the flange adapter where the flange adapter
and drain outlet will meet.
Insert the flange adapter into the drain outlet.
Partially thread the four screws into the flange adapter.
Place a rag in the drain outlet to prevent mortar from falling into the drain outlet.
1090854-2-B
Step 2/Étape 2/Paso 2
Screws/Vis/Tornillos
Plate/Plaque/Placa
Ring/L'anneau/Anillo
Subfloor
Body/Corps/Cuerpo
Plancher
Subpiso
Screws/Vis/Tornillos
Collar/Collier/Collarín
Flange Adapter
Adaptateur de bride
Adaptador de la brida
Apply PVC cement.
Appliquer du ciment PVC.
Aplique cemento para PVC.
Drain Outlet
Sortie de drain
Salida del desagüe
6
Kohler Co.