D-Link DGS-1248T Guía De Instalación Rápida página 2

Ocultar thumbs Ver también para DGS-1248T:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Setup the DGS-1248T Gigabit Smart
Switch
The setup of the Switch can be performed using the following steps:
A.
Install the DGS-1248T in a fairly cool and dry place. See Technical
Specification for the acceptable operation temperature and humidity
ranges.
B.
Install the DGS-1248T in a site free from strong electromagnetic
field generators (such as motors), vibration, dust, and direct
exposure to sunlight.
C.
Leave at least 10cm (about 4 inches) of space at the front and rear
of the hub for ventilation.
D.
Visually inspect the DC power jack and make sure that it is fully
secured to the power adapter.
E.
Install the DGS-1248T on a sturdy, level surface that can support
its weight, or in an EIA standard-size equipment rack.
F.
When installing the Switch on a level surface, attach the rubber feet
to the bottom of each device. The rubber feet cushion the hub and
protect the hub case from scratching.
Attach the adhesive rubber pads to the bottom
2

Publicidad

Tabla de contenido
loading

Tabla de contenido