How To Assemble The Machine; How To Prepare The Machine For Operation - Clarke CTV7 Libro De Instrucciones

Tabla de contenido

Publicidad

Figure 2
Figure 3
Figure 4
Figure 5
Page
-16-

HOW TO ASSEMBLE THE MACHINE

CAUTION!
On delivery, the accessories - are lying in the tank and
must be removed before the machine is used for the first
time. See figure 2 (figure is for CTV 7, but other units are
similar).
To assemble the machine, remove the machine top
section:
The power cord must not yet be inserted into a plug
socket.
1. Open the retaining clamps and lift off the machine top
section (Figure 3).
2. Place a bag-type filter into the tank as described in the
instructions printed on the filter.
3. Fit the machine top section back on the tank, and close
the retaining clamps.
4. Connect the suction hose. The "Wap Multifit" enables
any Clarke suction hoses (27, 32, 36, 50 mm diameter)
to be connected to the machine (Figure 4).

HOW TO PREPARE THE MACHINE FOR OPERATION

To prepare the machine for operation, follow this procedure:
1. Remove tool kit from carton.
2. Remove head assembly from tank before removing tank
from carton.
3. Remove tank assembly from carton.
4. Attach head assembly to tank.
Ensure that the machine is switched off and insert the
plug of the power cord into a properly installed and fused
plug socket with ground.
Connecting Electric Tools - (For CTV 7 AS)
Connect the electric tool to the appliance plug socket on
the control panel (Figure 5).
Before connecting a tool, ensure that both the machine and
the tool are switched off.
For maximum power consumption of the electric tool to be
connected, see the Specification Table on page 5.
®
Clarke
Wet/Dry Vacuums Operator's Manual

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ctv7 w/as/eCtv15Ctv20Ctv15 w/squCtv20 w/squ02170a ... Mostrar todo

Tabla de contenido