Toto Acrylic Instrucciones De Instalación página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Ensure that the unit is the correct model and color and that ex-
pected parts are present.
2. Inspect for shipping damage. Any damage claims must be
made to the carrier immediately. Do not install the bathtub if
any finish damage is revealed.
3. For AirBaths make sure that all air hoses and electrical con-
nections are properly connected.
4. Observe all installation procedures and local plumbing codes
and regulations.
5. Provide an appropriate, clean and level sub-floor.
Prepare Location
1

Remove old bathtub, if necessary.

Prepare sub-floor and level, if necessary.

Construct wooden frame.

Use template to ensure correct framing.

For AirBaths an access panel of at least 16" x 20" wide, or per
local code, must be installed at the blower end of the unit for
maintenance or servicing.

Locate and install rough plumbing.

All framing must be square and plumb.

The bathtub cannot be hung by its lip. The bathtub weight
must be transferred solely through the feet.
Test Fit
3
Test fit (dry fit) the bathtub in the frame to make sure the bathtub
will fit.
Notes
6. Ensure adequate space for the bathtub and provide properly
dimensioned framing.
7. Do not remove protective plastic until necessary. Cover the
bathtub with cardboard for additional protection.
8. Do not place ladders, tripods, building material, waste or other
equipment in the bathtub.
9. See spec sheet for dimensional information.
10. Power Supply Specification (AirBath only):
60 Hz, 120 V, 1050 W
ABR & ABY Installation
Install Drain (Sold Separately)
2
Install the drain according to the
manufacturer's directions and local
codes. The template is designed for
bathtubs using Toto drains.
Note: Take care not to scrape or mar
the bathtub while installing the drain.
Seat the bathtub into the framing.
4

Leave a 1/8" (3 mm) gap between the flange and the framing.

Mortar, plaster, or other adhesive should be used to secure
and level the bathtub.

Use two people to move the bathtub.

Assure the bathtub is level in both directions for proper water
drainage.

Any attached wood base should remain attached.