Connect the drain to plumbing
5

Follow local codes

Make sure that connections are tight to avoid leaks.
Finish decking and seal bathtub
7
With Flange
Silicone
ABR & ABY Installation (continued)
Silicone
Finished Surface
Optional Under Mount

See spec sheet to determine if this is available

Cut finished surface to desired dimensions.

Dry fit to the bathtub.

Temporarily mark on the bathtub the edge of the opening of the finished surface.

Remove the finished surface and apply silicone to the bathtub (underneath the
finished surface location).

Replace the finished surface and secure it.

Add and/or remove silicone as desired.

Make sure the finished surface is not supported by the bathtub and is secured per
local codes.
Make electrical connections (AirBath)
6

All electrical connections must be made by a licensed electrician and
meet local codes. Refrain from using extension cords.

Class A, 15 amp Ground Fault Control Interrupter (GFCI) with grounding
is required.

The controller, blower and GFCI must be accessible.

Pre-drill pilot holes through the tile-in flange.

Mount with screw or nail to studs.

Finish tiling the bathtub deck and be sure to seal the
bathtub lip to prevent leaks.
With Tile-in Flange