Ecoflam MAX GAS 40 P Manual De Instrucciones página 8

Ocultar thumbs Ver también para MAX GAS 40 P:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
420010385902 Max Gas 40 P - 70 P - 105 P - 120 P
420010385903 Max Gas 40 P - 70 P - 105 P - 120 P
EN
B
MODEL
MAX GAS 40 P
MAX GAS 70 P
MAX GAS 105 P
MAX GAS 120 P
4,0
3,0
2,0
1,0
0,6
0,5
0,4
d=0,3
0,3
d=0,225
0,2
0,1
12
24
(a)
d = diamètre chambre de combustion
kW
PRELIMINARY CHECKS
Before starting up the boiler check the following: - gas type and feed pressure; - gas valves closed; - the seals in the pipe
fittings; - gas pipe breather and input pressure; - that the cable complies with the diagram and the phase and neutral
wires correspond; - that the burner shuts down when the boiler thermostat opens; - the seal of the boiler furnace which
prevents air from entering; - the seal on the flue-boiler pipe fitting; - the condition of the flue (sealed, free from blocka-
ge, etc ). If all these conditions are present, start the burner. The control device starts the motor to carry out prewashing
of the combustion chamber. During this prewash period (about 30 seconds) the device checks that air pressure is correct
via the air pressure switch. At the end, it supplies power to the transformer and opens the gas valves. The flame must be
lit and stabilize within 3 seconds, which is the device's safety time limit. Check to ensure the flame is lit before placing
any control instrument in the flue. Adjust and check the gas flow necessary for the boiler at the meter. Adjust the air
flow according to the gas flow to obtain correct combustion.
IMPORTANT ADVICE
All adjustable parts must be fixed by the installer after making adjustments. Check flue combustion after each adjusti-
ment. The CO
values must be approx. 9.7 (G20) 9.6 (G25) 11.7 (G30) 11.7 (G31) and the CO must be less than 75
2
ppm.
A
C
P
A
B
C
D
288
143
145
85
303
155
148
85
317
169
148
140
317
169
148
160
D = SHORT HEAD
Installation must be carried out in compliance with the local provisions
d=0,6
d=0,5
d=0,4
40
70 100
190
STARTING-UP THE BURNER
D-D1
N
D1
E
F
G
185
153
89
160
185
204
89
160 100/120 100/120 M8
220
204
89
160 100/120 100/120 M8
240
204
98
160 100/120 100/120 M8
D1= LONG HEAD
The burners have been certified in combustion
d=0,8
chambers according to EN 676 standards.
d=0,7
Consult the burner manufacturer if the com-
bustion chamber of the boiler in which the
burner is to be installed has smaller dimen-
sions.
480
1200
2450
8
E
151
126
M
I
L
M
N
92/107 92/107 M8
54
52
52
52
I
O
P
73
-
71
82
71
82
71
82

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Max gas 70 pMax gas 105 pMax gas 120 p

Tabla de contenido