Supplies Required; Installation Instructions - Bradley S19-310BF Manual De Instalación

Combinación de ducha de aspersión y lavaojos de fácil acceso
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Installation

Supplies Required:

• (3)
" floor anchors and bolts
3
8
• Teflon tape and pipe sealant
• Piping to 1¼" NPT water supply inlet and 1¼" NPT
drain outlet on unit
• Adequate supply pipe supports
• Minimum 4" (102mm) drain to accommodate 30
gallons (115 liters) per minute discharge for shower
waste
• OPTIONAL: sign-mounting hardware
NOTE: Local codes may require the installation
of a backflow prevention valve to complete proper
installation. Compliance with local codes is the
responsibility of the installer. Valve must be tested
annually to verify that it is functioning properly. Backflow
prevention valves are not included with the fixture and
may be supplied by the contractor or purchased from
Bradley Corporation.
Step 1: Secure base to floor
1. Install three suitable anchors (supplied by installer)
for
" bolts in the floor.
3
8
2. Bolt the base to the floor anchors using
(supplied by installer).
Step 2: Assemble components
1. Assemble the remaining unit components as
shown on page 4.
• Apply pipe sealant (by installer) to all male-
threaded pipe joints.
• Use the rubber grip pad provided or a strap
wrench around pipes when tightening to prevent
marring. Place the grip pad on the pipe, then
put the wrench over the grip pad and turn the
pipe with the wrench.
• Thread the jam nut onto the threaded end of the
pull rod. Thread the pull rod onto the coupling
and tighten the jam nut. The triangular end of
the pull rod must be in line with the hook
end (see page 4).
• Bottom edge of the showerhead should be 85"
(2160mm) from floor.
Step 3: Connect water supply
IMPORTANT: Do not rely on Bradley's
Combination Unit to support supply piping.
1. Connect water supply piping to 1¼" NPT inlet
(piping by installer). Provide adequate supports
(by installer) for supply pipe using pipe hangers or
other means.
2. Connect drain piping to 1¼" NPT drain outlet
(piping by installer).
3. Hang the safety sign from the unit with the curtain
hooks provided (or mount it to the wall using sign-
mounting hardware by installer).
Bradley Corporation • 215-619 Rev. J; ECN 12-05-016B
4½"
(114mm)
85"
(2160mm)
to floor
" bolts
3
8
NOTE: All dimensions assume standard thread
engagement. Variations in manufacturing allow for
+/-
1
of a dimension, add the number of thread joints in
between a dimension and multiply it by
33
"
3
8
(848mm)
Ø 3.1"
(78.7mm)
9"
(229mm)
48"
(1219mm)
27"
(686mm)
(152mm)
Ø 10¾"
(273mm)
10
"
3
8
(264mm)
Top View From Bowl
" (3mm) per threaded joint. To find the tolerance
8
5/23/12
S19-310BF
65½"
(1664mm)
to floor
5½"
(140mm)
31"
(787mm)
6"
18¾"
(476mm)
Ø 9" (229mm)
Flange with (3)
Ø
" (10mm)
3
8
Holes on Ø 8"
(203mm) Bolt
Circle
" (3mm).
1
8
3

Publicidad

Tabla de contenido
loading

Tabla de contenido