A Ssembling T He D Rive U Nit - FlexiForce forceIQ Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 253
2.4.
Assembling   t he   d rive   u nit  
The   d oor   m ust   b e   c orrectly   i nstalled,   b alanced   a nd   b e   i n   c losed   p osition   b efore   t he   a ssembly   o f   t he   o perator.  
For   t he   o perator   a   m ounting   a ttachment   o f   > 500N   i s   r equired.  
 
 
 
 
1. Attach   t he   f irst   s top   r ing   t o   t he   s haft.  
2. Attach   t he   w all   b racket   w ith   4   s crews   a nd   w ashers   t o   t he   m otor.  
3. Push   t he   o perator   c ompletely   a gainst   t he   s top   r ing.    
4. Mount   t he   w all   b racket   t o   t he   w all   w ith   t wo   s uitable   s crews   a nd   w ashers.  
           
  P er   m ounting   a ttachment   > 500N   i s   r equired.  
5. Disengage   t he   d rive   u nit   f rom   t he   d oor   s haft   b y   m oving   t he   h andle   c lockwise   u ntil   i t   s tops,  
then   a im   f or   t he   k eyways   a t   t he   d oor   s haft   a nd   t he   o perator.   * The   w edge   s hould   p rotrude   a  
few   m m   f rom   t he   w all   b racket.    
6. Attach   t he   s econd   s top   r ing.   A   g ap   o f   a   f ew   m m   s hould   r emain   b etween   t he   s top   r ing   a nd  
the     w all   b racket.  
7. Tighten   a ll   s crews.  
8. Route   t he   c able   d own   t o   t he   c ontrol   u nit.  
 
 
 
 
 
www.flexiforce.com
manual – forceIQ
 
6
6  

Publicidad

Tabla de contenido
loading

Tabla de contenido